When homeowners ask about slate roofs, the conversation usually turns to the slate: Welsh purple, Spanish grey, reclaimed versus new. That's understandable, but it's only half the story. A slate is only as good as the way it's held down. Get the fixing method wrong and you can have the finest quarried slate in Britain lifting, cracking or rattling loose within a few winters.
There are three broad approaches used on UK roofs: nail fixing, hook fixing, and mixed systems that combine the two. Each has genuine strengths, and each suits particular combinations of pitch, wind exposure, slate size and budget. Here's what you need to know before your roofer starts setting out battens.
Nail fixing is the method most UK roofs have used for centuries. Each slate is pierced — usually two holes near the head — and nailed to the battens with copper, aluminium or stainless steel nails. The slate above then covers the nail heads of the course below, so the fixings are protected from the weather.
It's a proven, affordable system, and it allows the roofer to work quickly once the battens are set out. The catch is that it puts two small holes in every slate. On a sound slate with a properly punched hole, that's fine. But it does mean the slate is slightly weakened at its most vulnerable point, and any movement in the roof structure transfers stress straight to those holes.
Nail fixing still performs best on:
Use the wrong nail and the whole system suffers. Copper and stainless steel last decades; galvanised nails can corrode and stain the roof within fifteen years, so it's worth asking exactly what's going in.
Hook fixing uses stainless steel hooks that clip over the tail of each slate and grip the batten below. No holes are punched, so the slate stays whole, and the fixing resists uplift far better than a nail. That makes hooks a strong choice for:
The trade-offs are cost and appearance. Hooks are more expensive per unit than nails, and on an open roof you may see the hook tails sitting in the slate course. On some heritage roofs that's simply not acceptable, which is why hooks tend to appear on new-build, renovation and exposed-site work rather than on listed buildings. They are also slightly slower to install and require very consistent batten gauges, because every hook needs a clean purchase on the timber.
Many roofs are actually fixed with a combination. A common approach is to nail the centre of each slate and hook the corners, or to nail the field slates and hook the perimeter courses where wind uplift is strongest. This is genuinely useful on large roofs in exposed areas, where the edges, ridges and eaves take the brunt of the weather.
Mixed systems also appear where a roofer is matching an existing roof. If the original is nailed but the site is now more exposed than it once was — new trees felled, a neighbouring building removed — a partial hook upgrade on the vulnerable zones can extend the roof's life without a full re-fix.
The one rule with any mixed system is consistency. Don't nail some slates and hook others at random because the roofer ran short. The fixing pattern should be designed from the start, recorded, and repeated across the roof so stress is distributed sensibly.
The right choice comes down to a handful of practical questions. Ask your roofer to work through them with you before any battens go up:
British Standard guidance sets out minimum fixings per slate by pitch, and a competent roofer will know it. Where the spec is borderline, it's almost always worth upgrading to hooks on the exposed elevations while nailing the sheltered ones — the extra cost is modest against the price of scaffolding a few years later.
Fixing method aside, slate roofs reward a little attention. Twice a year, check for slipped or cracked slates, particularly after storms. Look at the ridge and hip lines, where mortar and dry-fix systems take the strain. Keep gutters clear so water doesn't back up under the eaves course. And if you see rust streaks or staining, that's often a sign of failing nails rather than failing slate — worth investigating early, because a single loose slate can let water track sideways into neighbouring courses.
A slate roof should give sixty years or more when the slates, the battens and the fixings are all specified to suit the building. Choose the fixing method deliberately, with an eye on pitch and wind, and you'll have a roof that stays put through whatever a British winter throws at it.
Leave A Comment